Studio tethering checklist: set-up to first frame

Free checklist · By the CloudTether team · Updated

Short answer: most tethering problems in a studio are physical — a cable pulled out of the port, a camera battery dying mid-set, a charge-only cable — so secure the cable at both ends, run the camera on mains power for long sessions, and keep recording to the card as a backup. Then lock in colour and naming before the first real frame, and prove the whole chain with one test shot.

Free download — no sign-up, no email

Everything is on this page too. Download it to print, edit or share; use it however you like.

How to use it

  1. Print one per shoot day and keep it on the tether table.
  2. Work top to bottom while setting up: the order follows the build, from table and cable to the test shot.
  3. Repeat the Colour section whenever the lighting set-up changes.
  4. Use the Wrap section before anyone leaves — it's the one people skip.

Tether table and workstation

Cable and strain relief

Power

Card and backup

Colour and profiles

Naming and organisation

Test shot

Wrap

Small things that save a shoot

  • Cable failures are usually at the connector. Strain relief at both ends matters more than an expensive cable.
  • A short, high-quality cable to a device on the tripod or stand beats a long run across the floor.
  • If the tether drops mid-set, keep shooting to the card and reconnect between frames — nothing is lost.
  • Shoot the slate before the product, every time. Renaming 300 near-identical frames afterwards is the slowest job in the studio.